I-95 at I-10 Fuller Warren

I-95 AT I-10 FULLER WARREN

CSI Geo provided geotechnical engineering services for the I-95 at I-10 Operational Improvements project in downtown Jacksonville, Florida. Improvements are proposed along I-10 from McDuff Avenue to the I-95 Interchange, then along I-95 over the Fuller Warren Bridge across the St. Johns River to just west of the FEC Railroad and San Marco Boulevard.

Overall, the project consists of widening five bridges, construction of a new flyover bridge, and a mechanically stabilized earth (MSE) approach embankment. The main project feature is the widening of the Fuller Warren Bridge over the St. Johns River (pictured).

CSI Geo conducted an extensive subsurface investigation, which required the mobilization of two barges into the St. Johns River, at times within the navigational channel. The subsurface investigation within the river included Standard Penetration Test (SPT) borings at each pier location, coring of the limestone formation, and collection of undisturbed samples within the marl formation. Additionally, pressure meter testing (PMT) equipment was mobilized and in situ PMT was performed within the marl formation beneath the St. Johns River.

Project Name: I-95 at I-10 Operational Improvements
Owner: FDOT District 2
Client: RS&H
Contact: Daniel Kristoff, P.E.

I-95 – I-295 NORTH INTERCHANGE IMPROVEMENTS

CSI Geo provided geotechnical engineering services for improvements to the I-95/I-295 North Interchange. The project consists of replacing the existing interchange with a fully directional, multi-level interchange with high and low level flyover ramps and bridges. The improvements include roadway widening along SR 9A, bridge widening along SR 9A and Cole Road, high-fill embankments, Mechanically Stabilized Earth (MSE) walls, drainage and ponds, box culverts, overhead signs, and high mast lighting.

CSI Geo conducted an extensive subsurface investigation for these improvements, performing geotechnical analyses and providing recommendations for design and construction.

Project Name: I-95/I-295 North Interchange
Owner: FDOT District 2
Client: URS Group, Inc.
Contact: John Saunders
Phone Number: (813) 877-6384